All of the rough in and framing is done, the electrical has been run, the plumbing has been run, all of the insulation has been put up, all that’s left to do is put the walls and finish it out. The loft was an add-on to the original container, it’s laid out for one bedroom, one bathroom, a kitchen and living room. It also has a very nice AC/heating system. It’s a 40 ft aluminum container with steel framing. 9 ft tall and 7.5 ft wide. The floors are the original floors that came in the container, they have been sanded and polyurethaned.
2 Saves | 1,839 Views | Report this Listing